Home
_________________________________________
Matrix Marquees
Instant Tents
Wedding Zone
Marquee Wedding Receptions
Personal Designed Weddings
High Bar
Chairs
Linen
Kids Tables and Chairs
Lighting
Floor Coverings
Red Carpet Rolls
Heating
Pedistal Fans
Catering Equipment
Portable Coolrooms
Dry Ice
Function Toilets
Helium Cylinder Hire
Disco Lighting
Disco Lighting Packages
 
_________________________________________
On Site Fuction Decorating
Special Events
________________________________
Contact Us
_________________________________________
Marquee Installation Guide
Marquee Capacity Guide
Customer Pickups
Delivery of Goods
Delivery Suburbs
Terms and Condtions of Hire
____________________________________
 
 
 

 

............................

Party Tents ae Hir

At least 50cm of clearance is required around the perimeter of the marquee for staking or weighting.


Example: The marquee pictured left is 6m x 3m but the floor space required (shaded grey) to to allow for pegs or weighting is 7m x 4m

e Melbourne.

finding the perfect location for your marquee



The site location is one of the most important decisions when hiring a party tent or marquee.

When considering the placement of the party tent or marquee, try to select a suitable area. We can install on all flat level surfaces, including grassed lawns, asphalt, concrete, wooden decking, paving, or any type of tennis court surface - no pegs.

If staking is required, be careful of the unseen underground factors that may affect the marquee placement, ie sprinkler systems, gas and water lines, sewage pipes, telephone and electrical conduit or wires, etc.
In most municipalities the local utility companies will visit the site and mark the locations of their pipes, wires etc.

The renter is responsible for the locating and marking of any underground utilities or services so as not to cause damage or injury to Having a Party's employees, the hirer, property, or guests.
The renter is responsible for obtaining all necessary permits required by council, city, and/or state.



.................

.......................

The height of our marquees must be considered when selecting a location. The eave height is 2.5m and requires at least this amount of overhead clear space. Centre peak height can reach over 6m on Matrix Series Marquees so avoid low hanging tree branches, roof eaves, etc.
Power lines require at least 5m clearance from any marquee structure.


If electrical power is required to the tent for lighting, etc. try to locate the marquee in an area where power can be easily accessed and run to the tent. It is preferred that our delivery vehicle can have access to the marquee location. If not, we need at least firm pathways leading to the site, due to the heavy nature of the equipment required.


WARNING This product has been manufactured for use as a temporary structure. For the safety of occupants, evacuation is recommended if threatening or extreme windy weather occurs, or if there is any doubt concerning the safe use of this product. Marquees are made from water resistant material. They are not guaranteed water proof.





4 Lindsay Ave, Nunawading | Vic 3131 | Australia
(03) 9894 1311

.......


© All text and images contained within this page are protected under all applicable copyright laws.